East Suurstoffi district in Rotkreuz / Switzerland

Project overview

Three new buildings are to be erected for Zug Estates AG on construction site F of the former industrial area. The lower floors of the up to 40-metre-high buildings will house commercial and service areas, while the upper floors are intended for residential space. The structure is a flexible frame construction, and all dividing walls are of lightweight construction and non-load-bearing. Basler & Hofmann is responsible for the pile foundations and structural systems of the buildings from preliminary study to implementation.

Our services

Drafting for the detailed design (formwork and reinforcement plans)

Expertise involved

Buildings

Client

Basler & Hofmann AG, General planner consortium BGP Bob Gysin + Partner AG and Sulzer+Buzzi Baumanagement AG