Immediate measures against landslides in Červený Kameň
An impending landslide jeopardised road III/1922 in the municipality of Červený
Kameň in 2019. To quickly restore the safety of bus, freight and passenger traffic,
Basler & Hofmann Slovakia developed an effective slope stabilisation system
consisting of drainage measures and a 100-metre-long stabilisation structure. The
carriage way was also repaired.
Kameň in 2019. To quickly restore the safety of bus, freight and passenger traffic,
Basler & Hofmann Slovakia developed an effective slope stabilisation system
consisting of drainage measures and a 100-metre-long stabilisation structure. The
carriage way was also repaired.
Our services
- Project planning for immediate measures