Modernisation of the Čunovo hydropower plant
The Čunovo hydropower plant near Bratislava is part of the Gabčíkovo hydropower plant on the Danube and has been generating electricity from a renewable source since 1997. After more than 25 years of operation, Basler & Hofmann Slovakia prepared the feasibility study for the modernisation of the electrical and mechanical systems, to ensure the longterm efficiency and safety of the operation and to reduce the environmental footprint of the power plant.
Our services
- Feasibility study